150’X175’ HANGAR
THE PROFESSIONAL ENGINEER WAIVES ANY AND ALL RESPONSIBILITY AND LIABILITY FOR PROBLEMS WHICH ARISE FROM FAILURE TO FOLLOW THESE PLANS, SPECIFICATIONS AND DESIGN INTENT THEY CONVEY, OR FOR PROBLEMS WHICH ARISE FROM OTHER’S FAILURE TO OBTAIN AND OR/ FOLLOW THE PROFESSIONAL ENGINEER GUIDANCE WITH RESPECT TO ANY ERRORS, OMISSIONS, INCONSISTENCIES, AMBIGUITIES, OR CONFLICTS WHICH ARE ALLEGED. BUILDINGS TO BE CONSTRUCTED IN FULL CONFORMANCE WITH ALL APPLICABLE CODES AND RESTRICTIONS. PROFESSIONAL ENGINEER TO BE NOTIFIED PRIOR TO CONSTRUCTION IN THE EVENT OF CODE REVISION OR CHANGES
THE PROFESSIONAL ENGINEER WAIVES ANY AND ALL RESPONSIBILITY AND LIABILITY FOR PROBLEMS WHICH ARISE FROM FAILURE TO FOLLOW THESE PLANS, SPECIFICATIONS AND DESIGN INTENT THEY CONVEY, OR FOR PROBLEMS WHICH ARISE FROM OTHER’S FAILURE TO OBTAIN AND OR/ FOLLOW THE PROFESSIONAL ENGINEER GUIDANCE WITH RESPECT TO ANY ERRORS, OMISSIONS, INCONSISTENCIES, AMBIGUITIES, OR CONFLICTS WHICH ARE ALLEGED. BUILDINGS TO BE CONSTRUCTED IN FULL CONFORMANCE WITH ALL APPLICABLE CODES AND RESTRICTIONS. PROFESSIONAL ENGINEER TO BE NOTIFIED PRIOR TO CONSTRUCTION IN THE EVENT OF CODE REVISION OR CHANGES